The complex consists of three blocks A-B-C Block (A) It is developed on a vertical plot of 900m2. It includes 4 ground floor residences of 35m2 (85,000€) and 4 residences of 35m2 on the first floor (75.000€) each residence has its own parking space and there is also a shared swimming pool measuring 10 meters X 5.5 meters. Its construction begins in March 2025 and will be delivered in May 2026. Block (B) is the central block of the complex and is also developed on a vertical plot of 900m2. It includes 4 ground floor residences of 35 sq m (85,000€) and 4 residences of 35 sq m on the first floor (75.000€), each residence has its own parking space, there is also a shared swimming pool measuring 10 meters X 5.5 meters. Its construction begins in March 2025 and will be delivered in May 2026. IMG_7887.jpg Block (C) is developed on a vertical property of a plot of 1200 sq m. It includes 7 ground floor residences of 35 sq m (100.000€) and 7 residences of 35 sq m on the first floor (90.000€), each residence has its own parking space, there are also 2 shared swimming pools measuring 9 meters X 6 meters. Its construction begins in September 2025 and will be delivered in September 2026. Τοποθεσία Location of project http://****.**?g_st http://****.**?preview.copy Προηγούμενο έργο (πουλήθηκε) Previous project (SOLD) Any interested buyers can visit it to see the build quality. http://****.**?g_st http://****.**?preview.copy Τρόπος πληρωμής Payment method!!! The potential buyers will give today an advance payment of €5000 at the beginning of the project in March 2025 they will give 30% of the price next installment 30% Jule 2025 with the progress of the work Next installment 30% November 2025 also with the progress of the work and payment with the final contrac.