Note
This description has been translated automatically by Google Translate and may not be accurate
reference: 1060
Even and buildable plot of 180.46 square meters, after its inclusion in the city plan. Within the plot there is a two-storey building of 452.57 m2, all legal and declared. The building consists of A) basement-warehouse 154.83 sq m above ground level B) from the ground floor floor of 152.13 sq m and C) 1st floor 145.61 sq.m. The ground floor consists of two residences of 68.80 sq.m. and 70.73 sq.m. and the first floor also consists of two residences of 62.88 sq.m. and 64.89 sq.m. respectively. This property is located directly opposite the entrance of KTEL Thessaloniki and belongs to the MUNICIPALITY OF AMPELOKIPON. * The square footage of this apartment listed in the advertisement comes from information received by our office from the principal - seller of the aforementioned property. The present measurements of the rooms (where indicated) do NOT include areas such as: internal corridors, wardrobe depth, partition walls, etc. so they are not a way of measuring the net total area of the property, they simply give an additional possibility of understanding the size of each space that makes up the property. **The amount of utilities shown in the ad is an approximation of the last utility bill of the apartment for which our office was informed. *** A wide-angle lens (UW Lens) has been used to photograph the apartment, in order to more fully cover the interior spaces of the property. In order to avoid misinterpretation of the size of each space, wherever possible, we take a video, so that its real dimensions can be understood. This property is immediately available to be indicated by us after a telephone or electronic appointment. Partner phone numbers 6988000092, 6938654373 & 2310862533. Awards: https://www.top100ofgreece.eu/company/500791/passas-real-estate For even more properties, visit our website: https://www.papafi.gr/el Passas Real Estate real estate agency Thessaloniki, Papafi 22A, 54639 Thessaloniki.
If you want to know more, you can talk to Μανώλης Πάσσας.
Year of construction
1964Condition
New / Under constructionEnergy certification
Waiting for certificationΜανώλης Πάσσας