1-bedroom flat Ναύπλιο, Αγία Κυριακή, Center, Nafplio
NafplioΝαύπλιο, Αγία Κυριακή
€ 140,000
2 rooms
49 m²
1 bathroom
Floor G
Lift
Balcony
Note
add
Listing updated on 11/07/2024
Description
This description has been translated automatically by Google Translate and may not be accurate
reference: 1003
Nayplio, Agia Kyriaki - Apartment 49sqm plot 400sqm, bedroom, levels 1, ground floor, under construction, energy class under issuance, living room, hall, kitchen, bathroom, heating type: autonomous, heating medium fan coil, parking open space, quiet, dual aspect apartment, luminous, frontage, solar heater, external thermal insulation, balconies, balcony 15sqm, elevator, garden, garden 15sqm, frames aluminum, double glazed windows, door screen, floor type ceramic tiles, secure door, ev charger, within city plan, residential zone, northern orientation, access from asphalt. A 49,67 sqm apartment under construction is for sale, in the Agia Kyriaki settlement of Nafplion. It is a bright apartment with south and north orientation consisting of a single living room in contact with the kitchen and direct access to a spacious terrace, a bedroom with direct access to a terrace and a private garden of 15 sqm and a bathroom with natural ventilation. It is located on the ground floor of a small apartment building with a total of four apartments, which will be built with modern specifications. It will provide independent cooling and heating system with Fan-Coil heat pump, solar water heater and one car parking space. It will have thermal facades, brickwork, elevators and waiting areas for electric car charging, a desalination system and a photovoltaic system to generate electricity on the roof. It is about 2,5 km from the old town of Nafplion and the organized Arvanitia beach. The following apartments are also for sale: - Ground floor apartment of area 68,23 sqm with a price of 190.000€ - Floor maisonette with an area of 106,54 sqm with a price of 297.000€ - Floor maisonette with an area of 77,17 sqm with a price of 215.000€ Construction work has already started and is scheduled to be completed by June 2025 at the latest.