This description has been translated automatically by Google Translate and may not be accurate
reference: 442267
For sale, a 2nd-floor apartment with 1 bedrooms, covering an area of 49 sq.m. (Total area including uncovered spaces 112,5 sq.m.), in a luxurious residential complex built in 2024, located in Elliniko. The location of the complex is less than a 10-minute walk from The Ellinikon Experience Park, the new mega mall to be constructed, and the "Elliniko" Metro station. The construction of the park has already begun, with works continuing for its expansion into the largest park in Europe. The complex offers luxurious studio apartments, detached houses, and two-bedroom apartments, fully furnished and with a view of the emerging city of Elliniko. Each apartment is designed to provide a modern, functional living space and to be a smart future investment. It also features an outdoor swimming pool, reception services, and a state-of-the-art gym, while offering underground parking for maximum security. The Elliniko area is a developing destination in the southern suburbs of Athens, known for its luxurious residences and excellent amenities. With a distance of approximately 30 minutes by car from the center of Athens, Elliniko residents can enjoy the tranquility of the suburbs while having easy access to central points of the city. Additionally, the area is located within close proximity to the Athens International Airport "Eleftherios Venizelos," easily accessible via the Attiki Odos. Moreover, the Port of Piraeus is at a reasonable distance, approximately 30 minutes by car. For Sale, apartment, Full Bathrooms: 1, Living Area: 49 Sqm, Rooms: 1, Year Built: 1978, Air Conditioning, View, Elevator, Furnished, Internal Stairs, Secure Door, Solar Water Heating, Alarm, Storage Space, Garage, Floor Number: 2, Facade, Pets Allowed, Kitchens: 1, Joinery: Aluminium, Accessible For Disabled, New Development, Heating Controller: Autonomous, Heating Medium: Natural Gas, Road Type: Asphalt, Zoning: Residential, Energy Class: B, Orientation: E, Current: Three Phase, Renovation Year: 2024