Glyfada, Golf New construction, completion in 3 months (January 2025), with INDOOR HEATING, HEATING PUMPS, HLIAKA PANEL, LIGHT BOLTS, FAN COIL. The temperature of the apartments is controlled by heat pumps, which feed fancoil circuits and underfloor networks, as well as by natural gas fireplaces. Hot water is supplied via a boiler, a triple energy system powered by solar panels, heat pump and power supply. The building is classified in the highest energy class (A++), as, in addition to the above systems, it has photovoltaic power generation systems, high-demand thermal facade and heavy-duty thermal break frames. The apartments offer 'smart home' capabilities, as well as fire safety, alarm, camera and wired data networks throughout, which interconnect with external fiber optic networks. Ground floor maisonettes available: 1) I1 Ground floor-attic + parking 1 + STORAGE 2 Total 186.15 sq.m. Garden 320 sq.m. Swimming pool 10 sq.m. €1,300,000 2)I2 Ground Floor-Attic + parking 8 + parking 11 + STORAGE 7 186.15 sq.m. Garden 320 sq.m. Swimming pool 10 sq.m. €1,300,000