This description has been translated automatically by Google Translate and may not be accurate
reference: EK-7759901
A complete renovation was carried out in 2020 and the plumbing, drainage and electrical network were completely replaced, as well as all window frames and external doors. ETEM energy frames, energy glass and screens were installed. All the carpentry, doors, cases, wardrobes as well as the kitchen were replaced. The bathroom was rebuilt from scratch (tiles, sanitary ware, batteries, accessories). The roof was insulated. The apartment has a solar water heater, air conditioning and an awning.