1. Office Building consisting of basement, ground floor and 1st floor.
2. Building A is located in the eastern part of the, consisting of basement, ground floor and a two-story office, construction of 1976.
3. Building B is located in the southeastern part of the plot with a shelter made of concrete blocks with a metal roof.
4. Building C is adjacent to building A (to its west), with which it constitutes an independent horizontal property , construction of 1976.
5. Building D is located at the back of the complex and adjacent to building C, consisting of basement, ground floor and first floor, construction of 1996.
6. Building E is located in the northeastern part of the plot and adjacent to building A, construction of 2003.
JM1